Talavera Bridge
Civil works
Roughly 100 kilometres south-west of Madrid, à Talavera de la Reina, VSL took part in constructing a cable-stay bridge and the approach viaducts over the River Tagus. This spectacular bridge, 318 metres long, is the tallest in Spain. VSL supplied and installed 152 cable stays, the dampers and 890 tonnes of post-tensioning cables for the bridge, which soon became a benchmark for cable-stay bridges.
152
cable stays installed
Public works
Public works
Know more