Talavera Bridge

Talavera Bridge

Civil works
-
Talavera Bridge
Talavera Bridge
Talavera Bridge
Talavera Bridge

Roughly 100 kilometres south-west  of Madrid, à Talavera de la Reina, VSL took part in constructing a cable-stay bridge and the approach viaducts over the River Tagus. This spectacular bridge, 318 metres long, is the tallest in Spain. VSL supplied and installed 152 cable stays, the dampers and 890 tonnes of post-tensioning cables for the bridge, which soon became a benchmark for cable-stay bridges.
 

152

cable stays installed

Public works
Public works

Bouygues Construction has developed its expertise in river and maritime works, highway structures, tunnels and underground infrastructures, as well as pre-stressing and cable-stay systems.
Roads and motorways, tramways, cable cars, underground trains, rail and port infrastructures... our international presence allows us to boast numerous iconic references.

Know more

Related achievements

The Port of Miami Tunnel
The Port of Miami Tunnel
Civil works
Know more
The Tangiers Med 2 container port
The Tangiers Med 2 container port
Civil works
Know more